Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online a week ago
Candidate
Male, 36 years, born on 13 December 1988
Considers offers
Krasnodar, willing to relocate (Other regions), not prepared for business trips
Head of construction and installation works, project manager, chief engineer
Specializations:
- Production engineer, quantity surveyor
Employment: full time, work placement
Work schedule: full day, rotation based work
Work experience 14 years 5 months
March 2021 — currently
4 years 2 months
LLC JUNIX
Kirishi, junix.ru/
Chief Engineer
- Analysis of the contract with the Customer for the implementation of the types and scope of construction work.
- Analysis of the POI by needs: labor resources, materials, tools, equipment in the volumes and terms according to the POI.
- Ensuring timely receipt of project documentation.
- Evaluation of the planned volume of construction work (performed by the management or subcontractors).
- Control of terms and performance of construction works.
- Discussion with the Customer of the correctness of marking the planned types of construction work.
- Informing the Customer about the detection of technical inconsistencies in the construction work in the POI.
- Informing the Customer about the progress of construction work, the planned completion dates.
- Determination of the types and volumes of construction work to be performed by subcontractors.
- Providing recommendations in the selection of a subcontractor for the work.
- Discussion of types of construction works, conditions for concluding contracts with subcontractors in cooperation with.
October 2020 — February 2021
5 months
NIPIGAS group of companies SIBUR
Lead Engineer
- Organization, control and coordination of construction and installation works of EPC contracts at the Amur Gas Processing Plant.
- Participation in the development of the operational schedule for the production of the EPC contract.
- Participation in the examination and registration of certificates for hidden and special works.
- Participation in the acceptance of completed construction and installation works, quality control and elimination of defects and defects by the construction contractor within the established time frame.
- Control of the construction contractor's performance of quality indicators of the CMP and work schedules.
- Interaction with EPC organizations.
- Record keeping and reporting.
- Monitoring of changes and deviations in the main indicators of the project, development of corrective measures and control of their implementation by contractors.
October 2016 — October 2020
4 years 1 month
LLC JUNIX
Construction superintendent
-Organization and implementation of pre-installation inspection, work with project documentation of capital construction projects;
- Registration of permits and approvals required for the production of construction works on the construction site;
- Planning and control of preparatory works on the construction site;
- Coordination of construction control in the course of construction, reconstruction, and overhaul of the capital construction projects;
- Determination of the needs of the construction process at the construction site in terms of building materials, structures, products and other types of materials and equipment;
- Determination of the range of construction equipment, machines and mechanisms required for the construction project;
- Consolidated operational planning and control of the construction process at the construction site;
- Coordination of construction processes in the course of construction, reconstruction, and overhaul of the capital construction projects;
- Development, planning and control of operational measures aimed at correcting defects of construction works at the construction site.
March 2015 — October 2016
1 year 8 months
LLC JUNIX
Construction coordinator
-Management of production and economic activities of the construction site.
- Ensuring the performance of production assignments on objects commissioning within the established timeframe and the performance of construction and installation and commissioning works in compliance with all quantity and quality indicators stipulated for, observing the requirements of works production projects. - Organization of construction and installation works in accordance with the project documentation, building codes, specifications and other regulatory documents.
- Ensuring and observance of the technological sequence of construction and installation works at a construction site.
- Implementation of measures aimed at the improvement of the mechanization level, the introduction of new equipment, labor organization enhancement, reduction of construction and commissioning costs, economical use of materials. - Provision and receipt of technical documentation for the construction of projects.
- Preparation of applications for construction machines, vehicles, mechanization devices, materials, structures, parts, tools, inventory and measures to ensure their effective use.
- Pre-commissioning works.
- Keeping records of the works performed.
- Participation in the delivery of the completed construction projects, separate stages and complexes of works on the projects put into operation, to the customers.
August 2013 — March 2015
1 year 8 months
LLC JUNIX
Сonstruction and assembly operations specialist
- Ensuring the implementation of the construction and installation works plan at the site in accordance with the working drawings, work production plan, the production plan and regulatory documents.
Control of the observance of the technological sequence of construction works and ensuring appropriate quality thereof.
Organization of acceptance of materials, structures, products, their warehousing.
Provision of construction machines, mechanisms, and vehicles and their efficient use at the construction site.
Organization and assignment of teams and units outside the teams, as well as individual workers, on the construction site.
Providing conditions that enable employees to achieve production targets.
Maintenance of employee training registration log.
March 2013 — August 2013
6 months
LLC JUNIX
Installer of technological pipelines and metal structures
-Installation of technological pipelines and related structures.
-Marking of pipeline laying sites.
-Installation of fittings, tees and sectional bends.
-Joining of pipes of all diameters, as well as shaped elements.
-Installation of pipelines with the installation of fittings, CPC and instrumentation.
-Installation of U-shaped, stuffing box and lens compensators of all diameters.
-Performing installation work with the use of rigging tools.
-Installation of hydraulic and electric valve actuators.
-Installation of static large-capacity equipment (columns; reactor) and small capacitive equipment (adsorbers; receivers; ABO sections, etc.), as well as dynamic equipment (centrifugal pumps, compressor units, turbines).
-Installation of all types of metal structures, namely: technological overpasses, shaft stairs, open and closed pumping stations, installation of bookcases, etc.
September 2010 — November 2012
2 years 3 months
Multimon
Technological pipelines assembler
-Installation of technological pipelines and related structures.
-Installation of sprinkler and drencher fire extinguishing systems, fine water systems, gas fire extinguishing, foam fire extinguishing.
-Installation of backup water tanks.
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category A, B, CAbout me
Experience of construction at large construction sites of the petrochemical industry as a General Contractor. Personnel management at the site with up to 130 employees, including engineering stuff. Successful commissioning of projects and their setting into operation. Experience of working with design and technical documentation, practical skills in the field of organization and coordination of construction and installation works. I have good organizational skills, knowledge of production processes and document management necessary for my work (SP, SNiP, GOST), and I am able to think outside the box to find solutions to production issues. I am demanding and hard-working. I know sections of projects and the requirements to their presentation, I can read drawings easily and present my own constructive suggestions; I am able to make independent decisions within the scope of my competence. Maintenance of reports in M-29 and M-19 forms and materials write-off under these forms.
Participation in and successful implementation of projects in the construction, reconstruction and overhaul of such facilities as
Construction of new plants:
- Deep Conversion Plant (ZGPN) for LLC "KINEF", Leningrad Region, Kirishi. Customer: OJSC "Surgutneftegas".
- Construction of Sulfide Waste Stripper for LLC KINEF, Leningrad Region, Kirishi. Customer: OJSC "Surgutneftegas".
- Construction of LK-2B complex LLC "KINEF", Leningrad Region, Kirishi. Customer: OJSC "Surgutneftegas".
- Construction of the oil refinery of JSC "NovoKuibyshev Refinery", Samara Region. Customer: JSC Rosneft Oil Company.
- Construction of a complex of UK-1 combined straight-run gasoline fractions processing plant. Kemerovo Region, Anzhero-Sudzhensk. Customer: NefteKhimService.
Modernization and overhaul of the following plants Customers: Surgutneftegaz, GazpromNeft:
- AT1, LPG storage facility, gas fractionation plant, bitumen plant, LCh-35-11/600, LG-24/7, Olefin production plant, L-24-10/2000, L-24/6, Parex No. 1; No. 2, LG-35-8/300B, AVT-6, Carbonization plant, LAB-LABS Plant, inert gas plant, Mixed xylenes and orthoparaxylene plant, Section 4100 (Steam reforming plant), Section 4200 (Hydrogen concentration section). Section 5800 (Condensate treatment Plant and engineering systems) and other installations.
My first job was in a foreign company, Multimon, which gave me a good impetus to achieve new goals and develop as the construction industry professional.
With Multimon, I participated in the construction of the following facilities:
1. Kronosrar, a laminated flooring production plant.
2. Volkswagen Rus: an automotive factory.
3. Kronoshpan, a laminated flooring production plant.
4. Mebelain: a factory making furniture for IKEA.
5. Ford Rus: an automotive factory.
Valid documents submitted to Rostekhnadzor (Federal Service for Environmental, Technological and Nuclear Supervision of Russia) include:
1.A.1 Industrial safety
2.B.1.16 Construction, reconstruction, and overhaul of oil refining industry facilities.
3.B.9.31 Operation of hazardous production facilities that use lifting devices designed to lift and move cargo.
4.B.9.32 Operation of hazardous production facilities that use lifting devices designed to lift and transport people.
5.B.9.33 Installation, adjustment, repairs, reconstruction or modernization of lifting systems during operation of hazardous production facilities.
6. NAKS level II certificate (National Agency for Testing and Welding): (Chemical, Petrochemical, Oil Refining, Explosion and Fire Hazardous Production Equipment: clauses 1,2,4,8,16), (lifting and transporting equipment: pp. 1,14), (BS: cl. 1,2,3,4)
Higher education
2019
Supplementary Vocational Training Center "Obrazovatelny Standart"
Construction Safety, Organization of construction at highly hazardous and technically complex and unique construction sites
2018
LLC "North-West Certification Research and Technical Center Energomontazh"
Autonomous Non-Profit Organization of Supplementaty Vocational Education North-West Training Center "Energomontazh", Welding production technology and equipment
2014
Industrial and civil engineering, Engineer
Languages
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Russia
Desired travel time to work: Doesn't matter